01 / PROJECT BACKGROUND
A home, a real experience.
Irina P.’s house in Voineasa, Vâlcea County, has a ground floor and loft. The owner supplied the design and foundation, while SIPROM supplied the structure and assembled the structural shell, handed over in July 2026.
After the structure was handed over, the owner independently arranged the metal roofing, façade and windows. Later, the owner contracted SIPROM separately for the interior finishing, which was in progress when this study was updated in November 2026.
According to the 140 m² house with loft in the catalogue, the total gross floor area is 140 m²: 70 m² on the ground floor, including the 22.50 m² covered terrace, and 70 m² in the loft. The stated usable interior floor area is 94.60 m²: 39.70 m² on the ground floor and 54.90 m² in the loft. The terrace is listed separately from the usable interior floor area.
The ground floor contains a 26.80 m² living room, 6.70 m² kitchen, 3.10 m² bathroom and 3.10 m² utility room, alongside the covered terrace. The loft contains three bedrooms, two bathrooms, a library, hallway and storage space.
02 / CONSTRUCTION DETAILS
The solution chosen for this house.
Structure and layout
Ground floor and loft, with three bedrooms, three bathrooms, a library, utility room and 22.50 m² covered terrace. Floor areas and layout are taken from the catalogue model referenced in this study.
Materials and dimensions
The structural model shows the timber components, panels and roof frame. The solution was built using the design supplied by the owner.
The handover stage
SIPROM supplied the structure and assembled the structural shell, handed over in July 2026. The owner supplied the design and foundation and separately arranged the metal roofing, façade and windows.
PROJECT TIMELINE
From design to assembly.
Structural shell handover took place in July 2026. Interior finishing is a later stage, contracted separately with SIPROM.
- Design and foundation
Supplied by the owner before SIPROM’s assembly work.
- Structure and assembly
SIPROM supplied the structure and carried out structural shell assembly.
- Temporary protection
SIPROM helped cover the roof decking with greenhouse film for a few days until the metal roofing team arrived.
- Structural shell handover
July 2026.
- Roofing, façade and windows
Arranged independently by the owner.
- Interior finishing
Contracted separately with SIPROM at a later stage; in progress in November 2026.