BRAȘOV, ROMANIA · VLAD G.
Two-storey SIP house, 172 m²
Complete design and structural shell assembly, including metal roofing. The owner arranged the foundation and subsequent work with local teams.
Handover: July 2026
Assembly: 12 working days + two days for metal roofing